Modified Duration and PV01 – Convexity | Bond Price Risk
- Blog|Company Law|
- 8 Min Read
Duration, modified duration, PV01 and convexity as the workbook teaches them, with the duration-based hedge ratio worked through on a Rs 26 crore bond portfolio.
- By Taxmann
- |
- Last Updated on 16 November, 2026
Table of Contents
- Why the price-yield curve bends
- Duration, and the payback period
- Does duration keep rising with maturity?
- Modified duration
- PV01: the rupee answer
- Convexity, and the error duration leaves behind
- Putting the two effects together
- The duration-based hedge ratio
- Where this sits in the paper
- Frequently Asked Questions
Together they are worth 12 of the 150 marks on the V-D paper, across Chapter 18 and Chapter 22. They are also the arithmetic behind every interest-rate hedge a debt fund puts on.
1. Why the price-yield curve bends
Price and yield move in opposite directions, and the relationship is a curve rather than a line. Four properties of that curve matter for an option-free bond.
- The percentage price change for a given yield change differs across bonds, because coupons, maturities and traded yields differ. On a 25 basis point rise in yield from 4.08 per cent, the workbook’s 5.79 per cent GS 2030 falls 1.89 per cent while an 8.50 per cent GS 2030 falls 1.76 per cent.
- For very small yield changes, of one or two basis points, the percentage price change is much the same whether the yield rises or falls.
- For large changes, of 100 or 200 basis points, the price change is not the same for an equal rise and fall.
- When yields fall, the price change is bigger than when yields rise by the same amount. On the 5.79 per cent GS 2030, a rise in yield from 5.08 to 6.08 per cent moves the price 7.18 per cent, while a fall from 5.08 to 4.08 per cent moves it 7.88 per cent.
That fourth property is the whole reason convexity exists as a measure. The loss from a yield rise is smaller than the gain from an identical yield fall, and a straight line cannot describe both.
2. Duration, and the payback period
Duration is the time-weighted average of the present value of a bond’s known future cash flows. It is also described as the weighted average maturity, or the payback period: the weighted average time a bond has to be held for the total present value of its future cash flows to equal its current market price. It is measured in years.
Macaulay duration moves with four things, and the directions are examinable.
| Factor | Effect on Macaulay duration |
|---|---|
| Longer term to maturity | Higher, because the principal arrives later |
| Passage of time | Falls, as the remaining term shortens |
| Higher coupon rate | Lower, because larger cash amounts arrive early |
| Higher yield to maturity | Lower |
Two consequences follow. A zero-coupon bond has the highest Macaulay duration of comparable bonds, and its duration equals its maturity, because there are no intervening cash flows. For a coupon bond, duration is always less than maturity.
The yield effect is visible in the workbook’s own figure: the 5.77 per cent GS 2030 has a payback period of 7.50 years as on 26 October 2020 at a yield of 5.85 per cent, and 7.43 years if the yield moves to 6.50 per cent with everything else unchanged.
3. Does duration keep rising with maturity?
No, and this is the point most candidates assume the other way. Duration does not increase exponentially with maturity; it stagnates once a maturity level is reached.
| Settlement | Coupon | Maturity | Yield | Duration |
|---|---|---|---|---|
| 26 October 2020 | 5.77% | 3 August 2030 | 5.85% | 7.50 |
| 26 October 2020 | 5.77% | 3 August 2060 | 6.50% | 14.67 |
| 26 October 2020 | 5.77% | 3 August 2090 | 6.80% | 14.93 |
Thirty extra years of maturity, between 2060 and 2090, add a quarter of a year of duration. Past a point, the distant cash flows are discounted so heavily that they stop carrying weight.
4. Modified duration
Modified duration adjusts Macaulay duration to estimate price sensitivity directly. It is the Macaulay duration divided by one plus the yield to maturity per coupon period, and it is the figure by which the dirty price changes when the yield changes by 100 basis points.
On the workbook’s bond, with a Macaulay duration of 5.34 and a yield of 4.5 per cent:
- Annual coupon: 5.34 ÷ (1 + 4.5%) = 5.11. A 100 basis point move in yield moves the price about 5.11 per cent the other way.
- Semi-annual coupon: 5.34 ÷ (1 + 4.5%/2) = 5.22.
The working formula is that the percentage change in price equals minus modified duration multiplied by the change in yield. Use the dirty price, because that is what the investor actually pays and it includes accrued interest.
The limitation is built into the method. Modified duration describes a straight line, the price-yield relationship is a curve, and so the approximation is reasonable for small yield changes and progressively wrong for large ones.
5. PV01: the rupee answer
Price value of a basis point is the change in a bond’s price, in currency, for a one basis point change in yield. If the price moves from 100 to 99.95 on one basis point, the PV01 is Rs 0.05, or five paise.
Expressed through modified duration, PV01 equals the dirty price multiplied by the modified duration, divided by 10,000. The dirty price is used for the same reason as before: the whole value change for one unit of yield is what is being measured.
6. Convexity, and the error duration leaves behind
Convexity measures the curvature of the price-yield relationship, that is the part of a bond’s price sensitivity that duration cannot explain. Mathematically it is the second derivative of the bond valuation equation with respect to yield; practically, it is the size of duration’s mistake.
The direction of that mistake is consistent. Duration underestimates the price change when yields fall and overestimates it when yields rise, and the error grows with the size of the shock.
| Yield shock | Actual price change | Change implied by modified duration | Error |
|---|---|---|---|
| +0.10% | −0.6421 | −0.6610 | 0.0189 |
| +1.00% | −6.1797 | −6.6105 | 0.4308 |
| +2.00% | −11.8543 | −13.2209 | 1.3666 |
| −2.00% | 14.0846 | 13.2209 | −0.8637 |
At a 10 basis point shock the error is immaterial. At 200 basis points, duration alone overstates the loss by 1.37 and understates the gain by 0.86.
Computing convexity from first principles is tedious, because every cash flow enters the sum. The workbook does it once, for a three-year bond with a 10 per cent coupon, semi-annual compounding and a required yield of 9 per cent, and arrives at 8.2135; to compare a semi-annual bond’s convexity with an annual bond’s, it is divided by four. In practice the approximation is used instead, taking the prices at an incremented and a decremented yield against the base price, divided by twice the base price times the square of the yield change.
Four relationships are worth memorising. Convexity is higher for lower coupons, higher for lower yields, higher for longer maturities, and the convexity of a portfolio is the weighted sum of the convexity of its holdings.
7. Putting the two effects together
The change in a bond’s price is the duration effect plus the convexity effect. Take a bond with an annual modified duration of 10.66 and an annual convexity of 81.96, and a yield that is expected to fall 200 basis points, from 5 per cent to 3 per cent.
| Yield move | Duration effect | Convexity adjustment | Estimated price change |
|---|---|---|---|
| Fall of 200 bps | +21.32% | +3.28% | +24.60% |
| Rise of 200 bps | −21.32% | +3.28% | −18.04% |
The convexity adjustment is added in both cases, which is what produces the asymmetry: because convexity is positive, the percentage gain on a yield fall is larger than the percentage loss on an identical yield rise. Carry the workbook’s convention for the adjustment into the exam, since textbook treatments differ on whether the convexity term is written with a one-half factor, and the paper is set on the workbook.
8. The duration-based hedge ratio
A bond holder rarely holds one bond, and interest rate futures do not exist on every bond. The hedge is therefore built on weighted average modified duration rather than on the securities themselves. The maximum short position in interest rate futures that may be taken to hedge a portfolio, or part of one, is the portfolio’s modified duration multiplied by its market value, divided by the futures’ modified duration multiplied by the futures price over par. That ratio takes the duration of the whole position to zero.
The workbook’s example: a portfolio of government bonds worth Rs 26 crore with a portfolio duration of 6.1, bond futures with a duration of 4.7, a one-month GOI bond futures price of Rs 98.50 and a lot size of 2,000 units.
| Step | Figure |
|---|---|
| Portfolio value × portfolio duration | Rs 26,00,00,000 × 6.1 |
| Futures price × futures duration × lot size | 98.50 × 4.7 × 2,000 |
| Number of futures contracts | 1,713 lots, approximately |
Two limitations come with it, and both are worth saying out loud to anyone relying on the number. Duration measures are accurate only for small yield changes, so in a large move the convex price-yield relationship means the position is underhedged. And the portfolio and the futures contract need not move in step, which is basis risk.
9. Where this sits in the paper
Chapter 18 of Mutual Fund – Specialized Investment Fund Distributors, the NISM workbook for the NISM-Series-V-D examination, carries the price-yield properties, duration, PV01 and convexity with the full tables, and is worth 6 marks. Chapter 22 carries the hedging strategies, including this one, for another 6. The interest rate derivatives block runs to 30 marks of the 150.
A duration-based hedge inside a mutual fund scheme has to sit within SEBI’s limits on derivative exposure as well as the exchange’s contract specifications, and Taxmann.com | Premium carries the whole library across SEBI, tax and corporate law for checking both in one place.
For the equity side of the same syllabus, see option Greeks and option pricing. For the certification, see NISM-Series-V-D explained and the V-D syllabus, module by module. Our earlier note on interest rate derivatives covers the instruments these measures are applied to.
10. Frequently Asked Questions
What is modified duration?
Macaulay duration divided by one plus the yield to maturity per coupon period. It is the percentage by which a bond’s dirty price changes when its yield changes by 100 basis points, in the opposite direction. A Macaulay duration of 5.34 at a 4.5 per cent annual yield gives a modified duration of 5.11.
What is PV01?
The change in a bond’s price, in rupees, for a one basis point change in yield. If the price falls from 100 to 99.95 on one basis point, PV01 is five paise. Through modified duration, PV01 equals the dirty price multiplied by the modified duration and divided by 10,000.
Why is convexity needed if we have duration?
Because duration describes a straight line and the price-yield relationship is a curve. Duration underestimates the price gain when yields fall and overestimates the loss when yields rise, and the error grows with the shock. At a 200 basis point move it is material; at 10 basis points it is not.
Does duration keep increasing with maturity?
No. Duration does not rise exponentially with maturity and stagnates past a point. On the workbook’s figures, a 5.77 per cent bond maturing in 2060 has a duration of 14.67 and one maturing in 2090 has 14.93, so forty additional years of maturity add about a quarter of a year of duration.
How is a bond portfolio hedged with interest rate futures?
On a duration basis. The number of contracts is the portfolio’s modified duration times its market value, divided by the futures’ modified duration times the futures price over par. For a Rs 26 crore portfolio with duration 6.1, futures duration 4.7, futures price 98.50 and a 2,000-unit lot, that is about 1,713 lots.
What are the limitations of a duration-based hedge?
Two. Duration is accurate only for small yield changes, so a large move leaves the position underhedged because the real price-yield relationship is convex. And the portfolio and the futures contract may not move in tandem, which leaves basis risk on the hedge.
More in this series
- NISM-Series-V-D Certification – Exam Pattern | SEBI Mandate
- Option Greeks – Delta | Gamma | Theta | Vega | Rho
- NISM V-D Syllabus – 150 Marks | Modules | Chapter Weightages
- Total Expense Ratio – SEBI Slabs | Base TER | Disclosure
- SIF Distributor Rules – Certification | Rs 10 Lakh | Duties
Law stated as on 14 October 2026. Syllabus, weightages and workbook references are those of the March 2026 Workbook Version of NISM-Series-V-D.
Disclaimer: The content/information published on the website is only for general information of the user and shall not be construed as legal advice. While the Taxmann has exercised reasonable efforts to ensure the veracity of information/content published, Taxmann shall be under no liability in any manner whatsoever for incorrect information, if any.

Taxmann Publications has a dedicated in-house Research & Editorial Team. This team consists of a team of Chartered Accountants, Company Secretaries, and Lawyers. This team works under the guidance and supervision of editor-in-chief Mr Rakesh Bhargava.
The Research and Editorial Team is responsible for developing reliable and accurate content for the readers. The team follows the six-sigma approach to achieve the benchmark of zero error in its publications and research platforms. The team ensures that the following publication guidelines are thoroughly followed while developing the content:
- The statutory material is obtained only from the authorized and reliable sources
- All the latest developments in the judicial and legislative fields are covered
- Prepare the analytical write-ups on current, controversial, and important issues to help the readers to understand the concept and its implications
- Every content published by Taxmann is complete, accurate and lucid
- All evidence-based statements are supported with proper reference to Section, Circular No., Notification No. or citations
- The golden rules of grammar, style and consistency are thoroughly followed
- Font and size that’s easy to read and remain consistent across all imprint and digital publications are applied


CA | CS | CMA